Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

Part of a €350m mixed-use development in the heart of this city’s historic port area, Limassol Marina officially opened in June 2014. The development comprises a 520 berth marina within an extensive and high quality residential and commercial development, much of which is built on reclaimed land providing an additional 125 dedicated residential berths.

Camper & Nicholsons Marinas was contracted to provide
the technical support on the design, construction and commissioning, followed by the operational oversight of the Marina under a term management agreement with co-owners Francoudi & Stephanou.

Gallery
Added value:
  • Re-designed and optimised the berth layout significantly
  • Early consideration of the master plan resulting in a more efficient and safe operation
  • Optimised design of boat yard and additional infrastructures
  • Preparation and adjudication of Marina tender documents
  • Blue Flag prestigious international award
Capital cost and financial implications:
  • Preferential rates obtained from world renowned marina equipment suppliers
  • Significant initial uptake in berth occupancy resulting from exposure to C&N network
  • Minimised dredging requirements as a result of C&N database research

For a list of our current and recent marina planning, design, consultancy, development projects around the world, click here.

case study

Case Study – Sanya Marina

Increased revenue from an improved berth mix

case study

Case Study – Dubai Harbour

Largest maritime and leisure hub in the Middle East designed by Camper & Nicholsons Marinas

case study

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

case study

Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

case study

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

case study

Case Study – Cesme Marina

Winner of 2014 PIANC Marina Excellence Design Jack Nichol Award

case study

Case Study – St Katharine Docks

Flexible berth layout provides a maritime centre for international events based in London

case study

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

Sign Up For Our Wavelength Newsletter