Thank you for subscribing to our newsletter.

Newsletter Signup

Please check the errors in the form and fill the required fields with *

close-button
Hero

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

Situated in Malta, long considered a major maritime crossroads, Grand Harbour Marina was one of the Mediterranean’s largest purpose-built superyacht marinas when it opened in 2002. It offers 50 berths for yachts of 25 to 100 metres LOA, 225 pontoon berths and additional moorings for locally owned craft.

Gallery
Added value:
  • A true urban renewal scheme with the transformation of derelict commercial quays into pleasant waterfront promenades
  • Increased berthing tariffs by an average 13% per annum since 2005
  • An uplift to local property values
  • Best utilisation of available water area
  • Luxury facilities developed in and around the marina
  • Berth design centred around providing maximum operational flexibility
  • Proud host marina to the Rolex Middle Sea Race, and Trophée Bailli de Suffren
Capital cost and financial implications:
  • Repair and embellishment of existing quaysides (former naval base)
  • Use of flexible pontoon moorings, otherwise reducing piling cost in deep water
  • Ability to create additional berths, at reduced cost

For a list of our current and recent marina planning, design, consultancy, development projects around the world, click here.

case study

Case Study – Sanya Marina

Increased revenue from an improved berth mix

case study

Case Study – Dubai Harbour

Largest maritime and leisure hub in the Middle East designed by Camper & Nicholsons Marinas

case study

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

case study

Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

case study

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

case study

Case Study – Cesme Marina

Winner of 2014 PIANC Marina Excellence Design Jack Nichol Award

case study

Case Study – St Katharine Docks

Flexible berth layout provides a maritime centre for international events based in London

case study

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

Sign Up For Our Wavelength Newsletter